Office Decommissioning — Getting the Space Back to What the Lease Says
The end of a lease is a deliverable with a date and a dollar value attached. We de-install, clear, remove cabling, dispose of and donate what is left, and hand the space back broom-swept — with the photographic record you will need if the landlord disputes it.
By the numbers
Lease
Read Before We Quote
Photo
Handover Record
Dated, room by room
COI
Landlord Named
3-Way
Donate · Recycle · Dispose
What this looks like
The operational reality.
Decommissioning is the part of an office move nobody budgets for and everybody gets billed for.
The lease says the space comes back in a defined condition — usually broom-swept, sometimes with specific make-good obligations: partitions removed, cabling pulled, wall penetrations patched, carpet cleaned or replaced. Miss the date or miss the condition and the landlord does the work and bills it against the security deposit, at rates nobody negotiated.
Meanwhile the tenant is focused on the new space, which is where the excitement is. The old one becomes an afterthought about ten days before the keys are due, at which point the options are expensive.
Muscleman Elite handles the exit as its own scope, with its own schedule, usually in parallel with the move into the new space. That means somebody is reading the lease's surrender clause while somebody else is installing workstations across town — and the two are sequenced so furniture leaving the old floor is not furniture you still need on Friday.
We do the physical work: de-install, removal, disposal, donation, cabling pull, and the clean handover. We are not an environmental abatement contractor and we do not do electrical or structural make-good. Where the lease requires those, we say so early and coordinate around the trades that do.

What makes this hard
Not a generic move.
The lease, not the schedule, defines "done." Every surrender clause is different. Some require broom-swept and nothing more. Some require every low-voltage cable pulled back to the closet. Some require partitions out and walls patched to original condition. Reading that clause before quoting is the whole job — a scope built on assumption is a scope that gets rejected at inspection, when there is no time left to fix it.
Abandoned cabling is the most-missed obligation. Low-voltage and data cabling above the ceiling is invisible, forgettable, and frequently a written requirement. It is also a fire-code issue: abandoned cable that is not plenum-rated is supposed to come out. Tenants discover this at inspection, which is the worst possible moment.
Used office furniture is worth much less than owners think. The instinct is to sell it and offset the cost. In practice the resale market for used cubicles and casegoods is thin, liquidators are selective, and the realistic outcomes are donation with a receipt, recycling, or disposal — each with different costs and different paperwork. We will tell you which of the three your furniture actually is before you build a budget on the first one.
Donation has requirements and a lead time. Charities that take office furniture want it in usable condition, want to schedule, and often want to choose. A donation plan made three days out is a disposal plan with extra steps. Made three weeks out, it genuinely reduces the bill and produces a receipt.
Data-bearing equipment cannot go in a skip. Copiers, MFPs and networked printers hold drives. Servers and network gear hold configuration and sometimes data. Those need either documented destruction or return-to-lessor handling, and the chain of custody matters. We segregate and document rather than assume somebody upstream dealt with it.
Building rules apply to exits exactly as they do to moves. Dock windows, freight-elevator-only routes, after-hours restrictions, COIs naming the landlord and property manager, floor and elevator protection. A departing tenant gets no more latitude than an arriving one — often less, because the relationship is ending.
Photograph everything, at handover. Condition disputes after the fact are decided by evidence. A dated photographic record of the space as handed back, room by room, is the cheapest insurance in the entire project and it takes twenty minutes.
“The lease defines "done." Everything we quote is read off your surrender clause, not off a template.”
How we handle it
The process.
1. Read the lease first. Send us the surrender or make-good clause with the scope request. What the lease demands sets everything else: the scope, the sequence, the trades that need to be involved, and the date the space actually has to be clear.
2. Walk the space and inventory the disposition. Every item gets a destination — relocate to the new space, donate, resell, recycle, or dispose. That inventory is the estimate. It is also the document that stops "we thought you were taking that" conversations in week three.
3. The written scope, itemised. De-install labour, removal, disposal by volume, donation coordination, cabling pull, data-bearing equipment handling, protection materials, and the final clean. Anything requiring a licensed trade — electrical, abatement, structural patching — is named as excluded and coordinated rather than quietly assumed.
4. Building paperwork and windows. COIs naming the landlord, property manager and any GC. Dock and freight-elevator windows booked for the exit, which on a multi-floor clear-out is several days rather than one.
5. Sequence against the move-in. Anything the business still needs leaves last. Where we are also running the move into the new space, the two schedules are built together so nothing is in a truck when somebody needs it.
6. De-install and clear. Workstations and systems furniture broken down, casegoods and seating out, appliances and fixtures removed per the scope. Protection down on the route before the first piece moves.
7. Cabling and low-voltage. Pulled back to the closet where the lease requires it, bagged and removed. We do not touch line-voltage electrical — that is an electrician's work and we schedule around it.
8. Disposition executed. Donations delivered with receipts, recyclables to the appropriate stream, disposal by volume. Data-bearing equipment segregated, documented, and handled to your instruction.
9. Broom-swept handover and the photo record. Final clean to the lease standard, then a dated room-by-room photographic record of the space as handed back, delivered to you the same day. If the landlord disputes condition later, you have the evidence rather than the argument.
Pricing factors
What moves the number.
- 01
Square footage and density.
A 4,000 sq ft open floor with 30 workstations is a different job from 4,000 sq ft of private offices. Density and furniture type drive de-install hours more than floor area does.
- 02
What the lease actually requires.
Broom-swept only is the cheap end. Cabling pulled, partitions out and walls patched is a materially bigger scope, and it is set by your surrender clause rather than by us.
- 03
Disposal volume.
Priced by volume, and it is usually the largest single line. The honest way to reduce it is donation and recycling planned with lead time — not optimism about resale.
- 04
Cabling removal.
Low-voltage and data cabling pulled back to the closet, priced by run count and ceiling access. Above-ceiling work in a fully furnished space costs more than in a cleared one, which is a sequencing decision.
- 05
Building constraints.
Dock windows, freight-elevator-only access, and after-hours or weekend-only work all add crew-hours, exactly as they do on the way in.
- 06
Data-bearing equipment.
Copiers, MFPs, servers and network gear segregated and documented, with destruction or return-to-lessor handled to your instruction. Priced per unit.
Decommissioning quotes as a written scope, not an hourly rate, because the cost is set by disposal volume and by what your lease demands — neither of which an hourly number captures. Send the surrender clause and we will walk the space and come back with an itemised scope. Where the lease requires licensed trades we do not carry, those are named as exclusions up front rather than discovered at inspection.
Common scenarios
What we actually see.
- 01
Tenant exit, broom-swept only.
Furniture out, floor cleared, space swept, photographic handover record. The straightforward case, and the one most leases actually require.
- 02
Full make-good with cabling pull.
Partitions and systems furniture de-installed, low-voltage cabling pulled back to the closet and removed, space cleared and cleaned, electrical and patching coordinated with the trades that hold those licences.
- 03
Downsize — keep some, clear the rest.
Run alongside the move into the smaller space. Everything is dispositioned at the walk-through: what moves, what donates, what recycles. Sequenced so nothing the business still uses leaves early.
- 04
Permian operator suite hand-back.
Midland and Odessa office and yard-adjacent space returned at lease end, with disposal arranged locally rather than hauled across the Basin.
Where we run this
Across Texas.
Office decommissioning runs across the Austin metro and the Permian Basin: downtown Austin towers and the CBD (823 Congress Ave), the North Austin and Domain tech corridor (7218 McNeil Dr), the MoPac and 360 office parks via Lakeway / Bee Cave (15201 Dexler Dr), Dripping Springs (12700 Daniel Boone Dr), the I-35 corridor through Buda and Kyle (3921 Dacy Ln), and Midland and Odessa (601 N Marienfeld St) for operator suites, mid-cap offices and clinic space.
Questions we get
About this move type.
- What is office decommissioning?
- Returning a leased commercial space to the condition the lease requires at the end of the term. In practice that means de-installing and removing furniture, clearing everything the tenant brought in, usually pulling low-voltage and data cabling, disposing of or donating what is not moving, and handing the space back broom-swept for the landlord’s inspection. It is the back half of an office move, and it is a separate scope with its own deadline.
- How do I know what my lease actually requires?
- Look for the surrender or make-good clause. It will specify the condition the space must be returned in — broom-swept at minimum, and frequently more: partitions removed, cabling pulled, penetrations patched, carpet cleaned. Send us that clause with your scope request. We quote against what it says rather than against a standard template, because the difference between broom-swept and full make-good is most of the cost.
- Do you remove data and network cabling?
- Yes — low-voltage and data cabling pulled back to the closet, bagged and removed, where the lease requires it. It is the single most-missed obligation in a tenant exit because the cable is above the ceiling and out of sight, and abandoned non-plenum cable is also a fire-code problem. We do not touch line-voltage electrical; that is an electrician’s work and we schedule around it.
- Can we sell the old furniture to offset the cost?
- Sometimes, but plan on less than you hope. The resale market for used cubicles and casegoods is thin and liquidators are selective. Donation with a receipt, recycling and disposal are the realistic outcomes for most inventory. We will tell you at the walk-through which of those your furniture actually is, so the budget is built on the real number rather than an optimistic one.
- What happens to copiers, servers and networked printers?
- They are segregated and documented rather than thrown in with general disposal, because they hold drives. Depending on your instruction they go to documented destruction, back to the lessor, or with you to the new space. Chain of custody is recorded either way — a copier in a skip is a data-breach story waiting to happen.
- Can decommissioning run at the same time as our move into the new space?
- Yes, and on most projects it should. We build the two schedules together so anything the business still needs leaves the old space last, and so crews are not competing for the same dock window at both ends. Running them in sequence rather than parallel usually costs more and risks the surrender date.
- What protects us if the landlord disputes the condition?
- A dated, room-by-room photographic record of the space exactly as handed back, delivered to you the same day. Condition disputes after the fact are decided on evidence, and twenty minutes of photography at handover is the cheapest insurance in the project. We do it on every decommissioning as standard.
- Do you handle asbestos, electrical or wall patching?
- No. Abatement, line-voltage electrical and structural patching require licences we do not hold, and we will not pretend otherwise. Where your lease requires that work, we name it as an exclusion in the written scope up front and coordinate our schedule around the trades doing it, so the space still gets handed back on time.
Ready to book?
Tell us the date.
Send the surrender clause from your lease and the square footage. We will walk the space, inventory what goes where, and come back with an itemised scope — de-install, removal, cabling, disposition and the broom-swept handover, with any licensed trades named as exclusions rather than surprises. Licensed: USDOT 2105156 · TxDMV 006568203C.